Water Supply Services

Supplying water in urban and rural areas is one of the active projects being conducted towards the country development.

Our approach consists of:

  • Evaluating the demand for Water Supply in addition to Drainage System;
  • Defining the quality of drinking water needed for distribution;
  • Evaluating the composition of waste to evacuate;
  • Evaluating the repartition of the flow in order to design the pipes and storage;
  • Determining the flow based on rainfall, necessary for sewers and spillway design.
Water supply/hydraulic works
PeriodServicesClient
From 01/2013 Control and supervision of construction works of Mugera-Rwerere drinking water supply in Burera District (44.520 km) Burera District
From 01/2013 Control and supervision of construction works of Mutobo Basse drinking water supply in Burera District (22.000 km)
From 01/2013 Control and supervision of construction works of Mutobo Haute drinking water supply in Burera District (22.0624 km)
03/2012-04/2012 Detailed study of Ruhunde-Rushara (62 km) in Burera District, Northern Province
03/2012-05/2013 Supervision of construction works of Nyabizi drinking water supply in Burera District (51.300 km)
Contractor : STRONG CONSTRUCTION Ltd
01/2011- 03/2011 Detailed study of Nyabizi drinking water supply (51.300 Km)
12/2008-2010 Control and supervision of construction works of drinking water supply in Gatsibo District

  • 1st contract: Rwasama source, sommet finance-Kabarore (21 km) - Executed by HORIZON Construction
  • 2nd contract: Rwasama source, sommet finance+distribution to Kabarore centre (28 km); Executed by STRONG Construction
  • Kanwiriri source to Sommet Kabarore (2.99 km) and junction to EWSA network (2.13 km); Executed by STRONG Construction
  • Sommet finance + distribution to Rwagitima centre, finance + Rwikiniro, Kabusunzu and Kiburara cells in Rwimbogo Sector (14.38 km); Executed by ECOGL
Gatsibo District
12/2008 -2010 Control and supervision of construction works of Kahi-Buhabwa (Executed by HYDRAUTEC) and Ryamanyoni-Karambi (by ECAN) drinking water supply in Kayonza District (25.62 Km) Kayonza District
12/2008-2010 Supervision of construction works for equipping high yielding boreholes with motorized pumps in the eastern province (Nyagatare, Gatsibo and Kayonza District) for the following sites:

  1. Ndama II site in Gatsibo District (2 km)
  2. Ryamanyoni site in Kayonza District (4 Km)
  3. Gacundezi site in Nyagatare District (1.676 km)
    Execution: ACOREBA
PDRCIU
 

TECOS - RWANDA

HEADQUARTERS: Kimihurura, Kigali - Rwanda
PHONE: (+250) 787100805 / (+250) 788300693
P.O BOX: 2025 Kigali Rwanda
E-MAIL: bureau.tecos@tecosrwanda.com
info@tecosrwanda.com

Find us on:
Follow us on Facebook Follow us on Twitter

Copyright © 2017 - Tecosrwanda.com - All right reserved